Gribbiasca

Last Update: 26.10.2023 by Wolfgang Streicher
Subregion: Bezirk Leventina
Town: Lavorgo
v5 a2 IV
3h43
10min
3h30
3min
960m
640m
320m
x
45m
2x50m/ 1x40m
8
650m
Car required
Specialities:
Dam (inform operator)
Rating:
★★★★★
3.5 (3)
Info:
★★★
2 (1)
Belay:
★★★
3 (1)
Summary:
Automatic weir (danger of water surge!!!); usually little water in the canyon but critical when there is a lot of water, so check the water level!; call the power plant operator!; beautiful individual passages; vertical final section; slippery abseils with some sharp edges; difficult emergency exit (left) before the vertical final section.
May - September
9-13 o clock
East